Hebron Christian Church

This project is a 2 story multi-purpose building. It includes a regulation size gym, a stage, kitchen, restrooms and classrooms on two floors. The building is framed with a Pre-Engineered building manufactured by A-S Building Systems. All exterior walls are split-faced block. Interior walls are concrete block at the gym area with the remaining walls metal studs and drywall.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>